The objective is: 
562.223
The running time is: 
243.608
The time meeting best is: 
227.399
Location: 2(load: 29370) 
 Route 0(load: 6350) 30 11 1 3 2 29 
 Route 1(load: 7920) 0 12 31 9 8 7 6 5 4 10 
 Route 2(load: 7250) 14 25 26 15 27 28 
 Route 3(load: 7850) 13 18 17 20 19 21 22 23 24 16 
The actual cost is 562.223